Pre-Handover Inspection Guide: The Most Important Inspection
The most important inspection — what to check, how to document and what to do.
Cost estimates only: Any building or upgrade figures in this guide are indicative, not fixed prices or quotes. Costs and inclusions vary by project, supplier, location and time. Confirm current written prices and specifications directly with your builder, suppliers and relevant trades.
- The pre-handover inspection (PCI) is your last chance to identify defects before handover
- Allow 2–4 hours and use a comprehensive checklist
- Document every defect with photos on the PCI form
- Don't make the final payment until defects are rectified
- Consider hiring a private inspector for this critical inspection
The pre-handover inspection — also called the practical completion inspection (PCI) — is the most important inspection of your entire build. It's your last chance to identify defects before you make the final payment and take possession of the home. A thorough PCI ensures the builder rectifies all issues before handover. This guide covers how to prepare, what to check and how to document defects.
How to Prepare
- Allow 2–4 hours — don't rush this inspection
- Bring a comprehensive checklist — see our Practical Completion Checklist
- Bring a camera/phone — take photos of every defect
- Bring a tape measure — to verify dimensions and openings
- Bring a spirit level — to check surfaces for level
- Bring a notepad and pen — to record defects
- Bring your contract and specifications — to verify inclusions
- Consider hiring a private inspector — $400–$800; they know what to look for
- Don't bring distractions — focus on the inspection
- Schedule the inspection during daylight hours for the best visibility
What to Check — Room by Room
Check every room systematically:
- Ceilings — plaster defects, cornice joins, paint coverage, cracking
- Walls — plaster defects, paint coverage, skirting, architraves, cornice
- Doors — alignment, operation, hardware, scratching, sealing
- Windows — operation, seals, scratching, cracking, locking, sill height
- Flooring — tiles (cracking, lipping, grout), timber (scratches, gaps), carpet (seams, stretching)
- Cabinetry — door/drawer alignment, operation, handles, scratching, damage, soft-close operation
- Tiling — grout consistency, alignment, lipping, cracking, waterproofing (wet areas)
- Plumbing — taps, drains, toilets, showers, baths (operation, leaks, correct model)
- Electrical — all lights, power points, switches, exhaust fans, appliances (operation)
- Paint — coverage, evenness, drips, splashes, correct colours, touch-ups
- Fixtures — tapware, vanities, toilets, baths, showers, oven, cooktop, rangehood (correct model, undamaged)
- Finishes — skirtings, architraves, cornice, seals, silicone, door frames
What to Check — External
- External walls — cladding, brick, render (alignment, finish, damage)
- Roof — sheets/tiles (alignment, flashings, damage)
- Gutters and downpipes — installation, fall, connections
- Windows and doors (external) — operation, sealing, scratching
- Driveway and paths — finish, cracking, level
- Fencing — if included (type, installation)
- Landscaping — if included (turf, plants, soil)
- Garage — door operation, sealing, paint, floor finish
- Site — clean, all rubbish removed, no construction debris
Watch Out
Documenting Defects
Document every defect thoroughly:
- Take a photo of every defect — with a ruler or coin for scale if needed
- Note the location (room, wall, surface), type and severity of each defect
- Record each defect on the PCI form (the builder should provide one)
- Number each defect for easy reference
- Both you and the builder should sign the PCI form
- Keep a copy of the signed PCI form
- Follow up in writing (email) confirming the defects and the agreed rectification timeframe
After the Inspection
- The builder should rectify all listed defects within the agreed timeframe
- Don't make the final payment until defects are rectified (or agree a retained amount)
- Once defects are rectified, do a follow-up inspection to verify the work
- If satisfied, make the final payment and accept handover
- If not satisfied, raise remaining issues in writing and follow the dispute process
- Can I schedule the PCI with 2–4 hours of uninterrupted time?
- Should I hire a private inspector for the PCI?
- Can I withhold the final payment until all defects are rectified?
- What form will the builder use to document defects, and will I get a signed copy?
- Rushing the PCI — 2–4 hours is needed for a thorough inspection
- Accepting handover with outstanding defects — leverage drops once you've paid
- Not bringing a checklist, tape measure, spirit level and camera/phone
- Forgetting to document every defect with photos on the PCI form
- Allow 2–4 hours for the PCI — this is your last chance to catch defects before handover
- Use a comprehensive checklist, bring a camera, tape measure and spirit level
- Document every defect on the PCI form — number them and take photos
- Don't make the final payment until defects are rectified — or agree a retained amount
Practical Completion Checklist
Use our comprehensive checklist for your PCI.
Frequently Asked Questions
Related Guides
Related Articles
Continue Comparing Builders
Planning a new home? Compare Australia's leading builders by inclusions, standard features and specifications before you sign.
Compare by State
Compare by City
Explore Estates & Services
Compare My Build
Compare Builders in Your Area
Choose your build location and compare standard inclusions before contacting the builders you shortlist.