Final Handover Checklist Guide: What to Check Before Accepting
What to check before accepting handover and what to document.
Cost estimates only: Any building or upgrade figures in this guide are indicative, not fixed prices or quotes. Costs and inclusions vary by project, supplier, location and time. Confirm current written prices and specifications directly with your builder, suppliers and relevant trades.
- Before accepting handover, conduct a final check of all surfaces, fittings and fixtures
- Ensure all PCI defects have been rectified
- Verify you receive all documentation — keys, warranties, certificates, manuals and plans
- Don't accept handover if significant defects remain — withhold the final payment
- Take out home and contents insurance from the date of handover
Accepting handover is the final step in the building process. Before you make the final payment and take possession, conduct a final check to ensure all PCI defects have been rectified and you have all the documentation you need. This guide covers what to check, what to receive and what to do if you're not satisfied.
Before Accepting Handover
- Verify all PCI defects have been rectified — do a follow-up inspection of the rectified work
- Check that the rectified work meets the standard — not just 'fixed' but fixed properly
- Verify no new defects have appeared since the PCI
- Check the site is clean — all construction debris removed
- Verify all inclusions are installed — check against the contract specifications
- Check all appliances operate — oven, cooktop, rangehood, dishwasher, air conditioning
- Check all plumbing operates — taps, toilets, showers, baths, drains
- Check all electrical operates — lights, power points, switches, exhaust fans
Documentation to Receive
Ensure you receive all of the following before making the final payment:
- Keys — all house keys, garage remotes, mailbox key, side gate key, alarm codes
- Warranties — all appliance warranties (oven, cooktop, rangehood, dishwasher, air conditioning), fixture warranties (taps, vanities, toilets), structural warranty certificate
- Certificates — electrical compliance certificate, plumbing compliance certificate, waterproofing certificate, termite protection certificate
- Manuals — appliance manuals, system manuals (alarm, air conditioning, solar, smart home), care and maintenance guide
- Plans — as-built plans, site plan, electrical plan (for future reference)
- Home warranty or compensation certificate / notice of cover — where applicable in your state or territory
- PCI form — the signed PCI form with the defect list and rectification status
Watch Out
What to Do If You're Not Satisfied
If you're not satisfied with the rectification of defects or the state of the home:
- Don't make the final payment — you can withhold it until defects are rectified (follow the contract)
- List the remaining issues in writing — email the builder with photos and a request for further rectification
- Agree a further timeframe — typically 5–10 business days for remaining items
- Consider a retained amount — if most work is complete, pay the remaining balance minus a retained amount for the outstanding defects
- If the builder won't rectify — contact your state's building authority
- Document everything — keep records of all correspondence and inspections
After Accepting Handover
- Take out home and contents insurance — from the date of handover
- Test everything in the first week — appliances, taps, doors, windows, lights, air conditioning
- Monitor for defects — hairline cracks, leaks, operation issues may appear as the home settles
- Report defects promptly — in writing, with photos, referencing the defect liability period
- Keep records — all correspondence, photos, warranties and certificates
- Maintain the home — follow the care and maintenance guide
- Update your address — notify relevant parties
- Have all PCI defects been rectified to a satisfactory standard?
- Am I receiving all documentation — keys, warranties, certificates, manuals and plans?
- Can I withhold the final payment until remaining defects are fixed?
- Do I need to arrange home and contents insurance from the handover date?
- Accepting handover without verifying all PCI defects have been properly rectified
- Not receiving all documentation — warranties and certificates are essential for future claims
- Forgetting to arrange home and contents insurance from the handover date
- Not doing a follow-up inspection to verify rectified work before paying
- Verify all PCI defects are rectified — not just 'fixed' but fixed properly
- Don't accept handover without all warranties, certificates, manuals and plans
- You can withhold the final payment or agree a retained amount for outstanding defects
- Arrange home and contents insurance from the handover date — don't leave a gap
Practical Completion Checklist
Use our comprehensive checklist for your final inspection.
Frequently Asked Questions
Related Guides
Related Articles
Continue Comparing Builders
Planning a new home? Compare Australia's leading builders by inclusions, standard features and specifications before you sign.
Compare by State
Compare by City
Explore Estates & Services
Compare My Build
Compare Builders in Your Area
Choose your build location and compare standard inclusions before contacting the builders you shortlist.