Inspections, Defects & Handover

Dealing With Defects: How to Raise, Resolve & Escalate

How to raise defects, builder obligations, dispute resolution and escalation.

5 min read·Compare My Build — Independent Resource· Updated July 2026

Cost estimates only: Any building or upgrade figures in this guide are indicative, not fixed prices or quotes. Costs and inclusions vary by project, supplier, location and time. Confirm current written prices and specifications directly with your builder, suppliers and relevant trades.

Key Takeaways
  • Report defects in writing — email creates a record that verbal conversations don't
  • Give the builder a reasonable timeframe to rectify (typically 10–20 business days)
  • If the builder won't fix the defect, contact your state's building authority
  • State building authorities provide dispute resolution services at no cost
  • As a last resort, you can take the matter to a tribunal (e.g. QCAT, NCAT, VCAT) or court

Finding defects in your new home is frustrating, but you have rights. The builder is obligated to rectify defects at no cost during the defect liability period. Understanding how to raise defects, the builder's obligations and the escalation process helps you resolve issues efficiently.

How to Raise a Defect

Follow this process to raise a defect:

  • 1. Document the defect — take photos, note the location, type and when it appeared
  • 2. Report in writing — email the builder with photos and a clear description
  • 3. Request rectification — ask the builder to rectify the defect within a reasonable timeframe
  • 4. Give a timeframe — 10–20 business days is standard for non-urgent defects
  • 5. Keep records — save all correspondence, photos and notes in a dedicated folder

Tip

Always report defects in writing (email). Verbal conversations are easily forgotten or disputed. An email creates a dated record of the defect, your request and the builder's response. If the issue escalates, your email chain is evidence. Follow up verbal conversations with a confirming email ('As discussed today...').

Builder Obligations

The builder is obligated to:

  • Rectify defects at no cost during the defect liability period (typically 3–6 months for non-structural, 6–7 years for structural)
  • Respond to defect reports within a reasonable timeframe (typically 10–20 business days)
  • Rectify the defect to the standard specified in the contract and building code
  • Not charge for rectifying defects that are their responsibility
  • Honour warranties on appliances and fixtures (pass through manufacturer warranties)

What If the Builder Won't Fix the Defect?

If the builder won't fix the defect (or won't respond), follow this escalation process:

  • 1. Follow up in writing — send a follow-up email referencing your original report and requesting a response
  • 2. Escalate to the builder's office — if the site supervisor isn't responding, contact the builder's office or manager
  • 3. Contact your state's building authority — they provide dispute resolution services:

State building authorities:

  • Queensland — QBCC (Queensland Building and Construction Commission)
  • New South Wales — NSW Fair Trading
  • Victoria — BPC (Building and Plumbing Commission)
  • South Australia — Consumer and Business Services
  • Western Australia — Building Commission
  • Tasmania — Consumer, Building and Occupational Services

4. Tribunal or court — as a last resort, take the matter to a tribunal (e.g. QCAT in QLD, NCAT in NSW, VCAT in Victoria) or court. The tribunal can order the builder to rectify the defect.

Dispute Resolution Process

State building authorities provide dispute resolution services:

  • You lodge a complaint with the building authority
  • The authority contacts the builder and requests a response
  • The authority may inspect the defect (or request a report)
  • The authority facilitates negotiations between you and the builder
  • If the builder is found to be responsible, the authority orders rectification
  • If the builder doesn't comply, the authority can take disciplinary action (fines, licence suspension)

If the Builder Is Insolvent

If the builder becomes insolvent during construction or while defects are still covered, the protection available depends on your state or territory. NSW uses Home Building Compensation (HBC/HBCF), while Queensland uses the Queensland Home Warranty Scheme. Other jurisdictions have their own arrangements. Check the cover for your project and contact the relevant regulator or insurer promptly.

Questions to Ask Your Builder
  • What is the defect liability period in my contract, and what does it cover?
  • What is the process for reporting defects — email, portal, or a specific form?
  • What is a reasonable timeframe for the builder to rectify non-urgent defects?
  • What is my state's building authority, and how do I contact them if escalation is needed?
Common Mistakes to Avoid
  • Reporting defects verbally without a written follow-up — no record if disputes arise
  • Not giving the builder a reasonable timeframe — 10–20 business days is standard
  • Escalating to the building authority before giving the builder a chance to respond
  • Not keeping a dedicated file of all correspondence, photos and inspection reports
Builder Tips
  • Always report defects in writing (email) with photos — it creates a dated record
  • Give the builder 10–20 business days for non-urgent defects; request urgent attention for safety issues
  • If the builder won't respond or rectify, contact your state's building authority for dispute resolution
  • Keep all correspondence — your email chain is evidence if you need to escalate

Warranty Claims Guide

Understand structural warranties and how to make a claim.

Read the Guide

Frequently Asked Questions

Continue Comparing Builders

Planning a new home? Compare Australia's leading builders by inclusions, standard features and specifications before you sign.

Compare My Build

Compare Builders in Your Area

Choose your build location and compare standard inclusions before contacting the builders you shortlist.