Bathroom Selection Appointment Explained: What to Expect & How to Prepare
What the bathroom selection appointment involves, what to prepare, and the decisions you'll make.
Cost estimates only: Any building or upgrade figures in this guide are indicative, not fixed prices or quotes. Costs and inclusions vary by project, supplier, location and time. Confirm current written prices and specifications directly with your builder, suppliers and relevant trades.
- The bathroom selection appointment covers vanities, tapware, toilets, shower screens, baths, tiles and plumbing fixtures
- It may be combined with kitchen and tile selections in a single appointment or split into separate sessions
- Bring your house plans with bathroom layouts, a mood board and a realistic upgrade budget
- Plumbing rough-ins (freestanding bath, wall-hung vanity, bidet) must be decided before construction
- Request a full bathroom upgrade price schedule before the appointment
The bathroom selection appointment is where you choose every fixture, fitting and finish for your bathrooms, ensuites and powder room. From vanities and tapware to toilets, shower screens, baths and tiles, the decisions are dense and can add up quickly. Walking in prepared ensures your bathrooms are both beautiful and functional.
What Is the Bathroom Selection Appointment?
The bathroom selection appointment is a scheduled meeting with your builder's colour or selection consultant. You'll choose fixtures, fittings and finishes for each bathroom in your home. Depending on the builder, this may be combined with kitchen, tile and paint selections in one or more appointments, or it may be a dedicated bathroom session.
Tip
What to Bring
- Your house plans with bathroom layouts — note dimensions, vanity size, bath position
- A mood board of bathroom styles (Pinterest, Instagram, display home photos)
- Your tapware finish preference (chrome, matte black, brushed brass)
- Decisions on major plumbing items — freestanding bath (yes/no), wall-hung vanity (yes/no), bidet (yes/no)
- A realistic upgrade budget for each bathroom
- A list of must-haves vs nice-to-haves for each bathroom
Decisions You'll Make
- Vanity — wall-hung or floor-mounted, single or double, size, colour, basin type
- Tapware — basin mixer, bath filler, shower mixer; finish (chrome, matte black, brushed brass)
- Toilet — close-coupled, back-to-wall, wall-faced, or smart toilet; button or plate flush
- Shower — fixed head, rain head, handheld, or combo; slider rail; shower screen type
- Shower screen — frameless, semi-frameless, or framed; glass thickness
- Bath — freestanding, built-in, or spa bath; if freestanding, style and position
- Shower niche — inset shelf; size, position, feature tile
- Bathroom tiles — floor tile, wall tile, feature tile (at the tile appointment)
- Accessories — towel rails, toilet roll holder, robe hook, soap dish
- Mirror — standard, LED backlit, or shaving cabinet
- Heated towel rail — if desired (plan power at electrical appointment)
Typical Upgrade Costs
| Upgrade | Example Cost |
|---|---|
| Wall-hung vanity (vs floor-mounted) | $300–$800 |
| Double vanity (vs single) | $500–$1,500 |
| Matte black / brushed brass tapware | $100–$400 per set |
| Frameless shower screen (vs semi) | $300–$800 |
| Freestanding bath (vs no bath / built-in) | $1,000–$3,000+ |
| Wall-faced toilet (vs close-coupled) | $200–$600 |
| Shower niche | $150–$400 |
| Heated towel rail | $200–$500 |
| LED mirror / shaving cabinet | $200–$600 |
How to Prepare
Visit display homes to see bathroom fixtures in person — photos don't capture the scale and feel of a vanity, bath or shower screen. Note what you like: tapware finishes, vanity styles, shower configurations, tile layouts. Think about how each bathroom will be used — the main family bathroom needs different features than an ensuite or powder room.
Decide on major plumbing items before the appointment. A freestanding bath, wall-hung vanity, or bidet all require specific plumbing rough-ins that must be in place before the slab is poured. If you're undecided, it's usually safer to include the rough-in (plumbing provision) during construction — you can always choose not to install the fixture, but adding plumbing later is very expensive.
Watch Out
- Can I get a full bathroom upgrade price schedule before the appointment?
- What's included as standard — vanity, tapware, toilet, shower screen, bath?
- Which plumbing rough-ins need to be decided before construction starts?
- Are bathroom tiles chosen at this appointment or at a separate tile appointment?
- Not deciding plumbing rough-ins (freestanding bath, wall-hung vanity, bidet) before construction
- Walking in without a mood board or finish preference — decisions under pressure are costly
- Forgetting that bathroom lighting and exhaust fans are planned at the electrical appointment
- Not coordinating tapware finish across all bathrooms and the kitchen for a cohesive look
- Request a full price schedule beforehand so you can budget per bathroom
- Decide major plumbing items before construction — freestanding bath, wall-hung vanity, bidet all need rough-ins
- If undecided on a fixture, include the rough-in during construction — adding plumbing later is very expensive
- Visit display homes to see bathroom fixtures at scale — photos don't capture feel and proportions
Bathroom Upgrade Costs Explained
See real-world example pricing for all bathroom upgrades.
Frequently Asked Questions
Related Guides
Related Articles
Continue Comparing Builders
Planning a new home? Compare Australia's leading builders by inclusions, standard features and specifications before you sign.
Compare by State
Compare by City
Explore Estates & Services
Compare My Build
Compare Builders in Your Area
Choose your build location and compare standard inclusions before contacting the builders you shortlist.