Introduction

Site costs are the costs incurred to prepare your specific block of land for construction. They are almost never included in a builder's advertised base price — and are one of the most common causes of new build budget blowouts. Understanding what site costs cover, how they're calculated, and how to minimise surprises is essential before signing any building contract.

What Site Costs Cover

Cost ItemWhat It Covers
Geotechnical reportSoil classification and bearing capacity testing
Slab upgradeUpgraded slab type based on soil classification
Cut and fill / earthworksLevelling a sloping or uneven site
Retaining wallsStructural walls to hold soil on sloping blocks
DrainageSurface and sub-surface drainage for water management
Service connectionsConnecting power, water, sewer and gas to the block
Driveway crossoverKerb cut and crossover to the property boundary
DemolitionRemoving existing structures if subdividing or rebuilding

Typical Site Cost Ranges

Cost Comparison
Flat M class site (best case)$5,000 – $12,000
Typical suburban block (H1, mild slope)$12,000 – $25,000
Sloping block with retaining walls$25,000 – $50,000+
Rocky sites or P class soils$30,000 – $80,000+
Service connections (rural)$5,000 – $25,000 extra
Site costs vary dramatically by location, block, and builder. Never sign based on an assumed nominal allowance.

Common Builder Inclusions

Common Builder Inclusions
  • ›Most builders include a nominal $5,000–$10,000 site cost allowance in their base price
  • ›Actual site costs are determined after soil testing and site survey — not before
  • ›Provisional Sums are commonly used — and commonly blow out
  • ›Fixed-price site cost offers do exist — ask specifically if your builder can provide one
  • ›Some builders offer 'full fixed price' contracts that lock in site costs — worth seeking

Common Trap

A builder advertising a $350,000 base price with a $5,000 site cost allowance may end up costing you $395,000 once actual site costs are determined. Always ask: "What is your maximum site cost exposure on this contract?"

Frequently Asked Questions

Continue Comparing Builders

Planning a new home? Compare Australia's leading builders by inclusions, standard features and specifications before you sign.

Compare My Build

Compare Builder Inclusions Side-by-Side

See which builders include more as standard — free, independent, no sign-up required.

Start Comparing Now