Skip to main content
Home›Build Knowledge Hub›Building Process›Frame & Structure›T2 Treated Timber vs Standard Timber Frame
Frame & Structure

T2 Treated Timber vs Standard Timber Frame

Compare T2 treated timber against untreated standard framing — what the difference means for termite protection, durability and your building contract.

5 min·Compare My Build — Independent Resource· Updated June 2025

Introduction

The timber framing in your new home can be either standard (T1 / untreated for termites) or T2 treated, which has been impregnated with preservatives to resist borer and termite attack above ground. For buyers in Queensland and other termite-prone regions, this distinction matters for long-term protection.

Key Differences

FeatureStandard Timber (T1)T2 Treated Timber
TreatmentNone or basic borer onlyTreated to AS 1604 H2/T2 level
Termite resistanceLowModerate (above-ground)
Borer resistanceLowModerate to high
Cost difference—Minimal (~$500–$1,500 extra)
Requirement in termite zonesNot always requiredRecommended, often required
Standard inclusionSome buildersMany QLD volume builders

Pros and Cons

Pros
  • + T2 provides additional protection for minimal extra cost
  • + Widely available — most major suppliers stock T2 framing
  • + Provides peace of mind in termite-prone regions
  • + Often mandated by councils in high-risk termite areas
Cons
  • − T2 alone is not sufficient — termite management system still required
  • − Some builders use standard timber and rely solely on chemical barriers
  • − Cost savings from standard timber are minimal vs the protection benefit
Cost Comparison
Standard timber frame (T1)Included
T2 treated timber frame upgrade$500 – $1,500
H2 treated timber (equivalent)$500 – $1,500
T2/H2 treatment is one of the most cost-effective protection upgrades available — the cost is low relative to the long-term benefit.

Common Builder Inclusions

Common Builder Inclusions
  • ›Many QLD volume builders include T2 or H2 treated framing as standard
  • ›Always confirm in your contract — 'timber framing' alone does not specify treatment level
  • ›Ask your builder to confirm: 'Do the wall and roof frames have T2/H2 treatment throughout?'

Frequently Asked Questions

Continue Comparing Builders

Planning a new home? Compare Australia's leading builders by inclusions, standard features and specifications before you sign.

Compare My Build

Compare Builder Inclusions Side-by-Side

See which builders include more as standard — free, independent, no sign-up required.

Start Comparing Now